Construction Management Services for the 1.3-mile section of US 1 is from Old Lincoln Highway (SR 2037) to north of the I-276 (PA Turnpike) ramps in Bensalem Township. US 1 will be reconstructed and widened to three (3) lanes directionally. Additional construction includes the reconfiguration of the US 1/PA 132 (Street Road) interchange, the replacement of three structurally deficient mainline bridges, the removal of a structurally deficient mainline bridge, and the replacement of an overpass (B
Client: PennDOT, District 6-0
Prime Consultant: Urban Engineers
Contract Period: October 2017 to Present
SP Engineering provides construction management and construction inspection services for a $13.3 million sign system and ADA ramp project in the Borough of Pottstown, Lower Pottsgrove Township, and North Coventry Township. The project involves the upgrade of traffic signal equipment at 50 intersections to implement a closed-loop system. The new signal controllers, new signal poles and mast arms, new LED signal heads, pedestrian signals, preemption, lighting, design-build ADA ramps, design-build
Client: PennDOT, District 6-0
Prime Consultant: SP Engineering, Inc.
Contract Period: November 2016 - Present
SP Engineering provided construction management service for the JFK Boulevard project, which involves replacing three existing bridge superstructures carrying JFK Boulevard over 21st Street, 22nd Street, and 23rd Street in the City of Philadelphia. Additional work includes the construction of a new pedestrian access structure at the northwest corner of 22nd Street and JFK Boulevard; full-depth pavement reconstruction; construction of new sidewalk, highway lighting, drainage, and landscaping, the
Client: PennDOT District 6-0
Prime Consultant: SP Engineering, Inc.
Contract Period: 2 years
SP Engineering provides construction management services for the $7 million Allegheny Avenue project in the City of Philadelphia, which involves design-build ADA ramps at many intersections from Ridge Avenue to Aramingo Avenue. Work includes the modernization of the traffic signal equipment, installation of ADA-compliant pedestrian facilities, installation of street lighting under overpasses, and roadway improvements, including installing curbing, pavement, sidewalk, drainage, and green stormwat
Client: PennDOT, District 6-0
Prime Consultant: SP Engineering, Inc.
Contract Period: December 2016 to December 2019
SP Engineering provided construction management services for the Erie Avenue project in the City of Philadelphia, which involves design-build ADA ramps at many intersections from Broad Street to K Street. Additional work includes directional boring for conduit installation, traffic signals and supports, fiber optic cables, and other miscellaneous construction.
Client: PennDOT, District 6-0
Prime Consultant: SP Engineering, Inc.
Contract Period: 2 years
SP Engineering will provide construction management and inspection, and documentation services for the rehabilitation of Tyburn Road. The project consists of replacing the bridge carrying Tyburn Road over AMTRAK and approximately 10,500 feet of roadway reconstruction.
Client: PennDOT, District 6-0
Prime Consultant: Johnson, Mirmiran, & Thompson
Contract Period: November 2012 to April 2016
SP Engineering provides construction management services for projects involving multiple sections of I-95 from Levick St. to Allegheny Ave. with an estimated value of over $800 million.
Client: PennDOT, District 6-0
Prime Consultant: Urban Engineers
Contract Period: 10 years
SP Engineering provides construction management services for projects worth over $150 million and on the I-95 corridor in Philadelphia. Duties involve administration of the construction contracts, C.P.M. schedule review and analysis, generation of meeting minutes, coordination of project documentation, claim review, and facilitation of progress meetings.
Client: PennDOT, District 6-0
Prime Consultant: Johnson, Mirmiran, & Thompson
Contract Period: July 2009 to June 2012
SP Engineering will provide as-needed construction management services under the Department's direction for various projects throughout the District. Contractual obligations involved providing project management, scheduling, technical assistance, and engineering functions. Some duties involve assistance with PennDOT's Electronic Construction Management System (ECMS), construction documentation, facilitating progress meetings, and C.P.M. schedule review and analysis. Additional duties involved pr
Client: PennDOT, District 6-0
Prime Consultant: Michael Baker Corporation
Contract Period: 5 years